Sunday, 22/4/2018 | 12:27 UTC+8
  • Langat 2 water treatment plant may only be ready by 2019

    The Langat 2 water treatment plant and its distribution system (LRAL2) project may only be fully completed in 2019 instead of 2017 as planned. Energy, Green Technology and Water Minister Dr Maximus Ongkili said this was because of the delay in executing the Selangor water supply industry restructuring agreement. “Right now, the Selangor government has

    Read more
  • MRT
    MRT 2 – 94% of affected residents approve

    This is good news for both MRT Corp and Klang Valley residents. To date, about 2,630 residents, or 94% of respondents who will be affected by the alignment of the MRT Sungai Buloh-Serdang-Putrajaya (SSP) Line 2, are happy with the project. “We conducted the survey from May 15 and received lots of Share us on:

    Read more
  • How often should you service your vehicle?

    Regular maintenance on your vehicle will extend the life of your engine and save you from costly repairs down the road.  So, how often should you service your vehicle? Table below shows the general guidelines. Item KM Month Engine Oil (Fully Synthetic)    10,000        6 Oil Filter    10,000        6 Brake Fluid   

    Read more
  • 5 benefits of GGBS & Fly Ash in the concrete

    There are many benefits to use GGBS or Fly Ash, the more significant are: IMPROVED & RETAINED WORKABILITY – for placing, ease of compaction & finishing – for coping with transport and site delays LOWER HEAT OF HYDRATION – for reduced risk of thermal cracking and long-term strength development LONG-TERM STRENGTH GAIN – for long-term

    Read more
  • Penang Integrated Transport Masterplan

    Penang traffic management exco Chow Kon Yeow announced the state government had received proposals from six bidders to be project delivery partners (PDP) of the master plan. Total RM27 billion Project expected begin from Share us on:

    Read more
  • KL-Klang elevated dedicated bus lane (BRT)

    PETALING JAYA: Sunway Construction Bhd, the builder of the country’s first elevated dedicated bus lane in Bandar Sunway, is a strong contender to bid for the expansion of the project, analysts said. This should fire up interest in the company, which is said to be planning to sell its shares to the public as early

    Read more
  • LRT 3 Bandar Utama – Klang rail project

    A total of 25 stations are planned, with proposed sub-two kilometer distances between them. There will be one underground station in the line, with the other 24 being elevated stations, and of the total, Share us on:

    Read more
  • What is Fly Ash?

    Fly Ash is the fine residue produced when hard or bituminous coal is burnt in power station furnace. The minerals in the coal fuse to form fine and glassy particles which contains constituents that can be used as Share us on:

    Read more
  • What is GGBS?

    Ground Granulated Blastfurnace Slag (GGBS) is a by-product from the blast-furnaces used to make iron. These operate at a temperature of about 1,500 degrees centigrade and are fed with a carefully controlled mixture of iron-ore, coke and limestone. The iron ore is reduced to iron and the remaining materials form a slag that floats Share

    Read more
F